Lorem ipsum dolor amet, consect adipiscing elit, diam nonummy.

Follow Us

Search

MIA South Terminal Expansion (New Concourse K) Design-Build

MIA SOUTH TERMINAL EXPANSION (NEW CONCOURSE K) DESIGN-BUILD

Expansion of the existing Miami International Airport (MIA) South Terminal with the design and construction of a new Concourse K with six (6) contact gates, associated apron and jet fuel hydrant service, Cruise Bus Station and 20th Street Modifications, a ground support equipment (GSE) maintenance facility and modifications to the existing Baggage Handling System (BHS) to provide for a crossover from the Central Terminal to the South Terminal and the installation of two (2) new make-up (carousel) facilities in the new Concourse K. The project is located east of the existing South Terminal.

CLIENT: Miami-Dade Aviation Department
LOCATION: Miami, FL
COMPLETION DATE: July 2029 Est.
BUILDING SF: 221,864 SF
SERVICES: Prime Contractor